Fin Fan NDE Procedure Review

Year: 2018 and 2019

Location: Burnaby, BC and Calgary, AB

Scope: Air Cooled (Fin Fan) Heat Exchanger Shop Fabrication Document Review

Overview:  Detailed Level 3 NDE review to ensure that Fabrication documents (weld procedures, MT procedure, UT procedure, etc.) meet ASME fabrication code of construction as well as end client specifications.